Friday, October 9, 2020

Prep work....

 I really enjoyed my day off Thursday. The morning was lazy and then I made a batch of soft pretzels. They were yummy! I might have sent this photo to Greg at work. He loves pretzels =).


I marked and cut Endless Diamond parts for the next 3 blocks.


Picked some fabrics for flowers. I'll hand baste some of the circles and I'll just needle turn the purple and blues. 


A bunch of vines were also made. These will be for the last border and all the corners and a few might stick out here and there for a flower or two.


I also got this little one finished! I used a special batting so it should be able to be used as a hot pad on the table. I believe it is about 9 inches square.



Not too bad for a day off. 

Thursday, October 8, 2020

Thursday...

I have not been doing much hand stitching this week. Games on the phone have been happening instead at night. I did make some progress on this last night. Just that one corner to stitch in and then I really need to prep some more of these today.

These 5 chickens - 3 barred rock (black and whites) and 2 easter egger (mix) spent the night outside! The coop was finished up enough for that. A little work is needed to dig and bury the wire to the ground so critters don't dig in and a door is needed in between the two. There might be a quilt hanging there right now after a couple decided to fly into the others section of the cages last night. They got put to bed early due to the rain last night. 

During some free range time Tuesday afternoon after not having any since Saturday. I supervise them as there are chicken hawks around. Lily decided to claim the chair as hers.

Arn't I a pretty girl?



Today is my day off working. Greg is off to work this morning. Kids are logging into school for the day. 

My Noom (Down 13 pounds since June 23 when I started!) has let me know today is a day off as well! I love that this is no special foods, nothing is off limits and it wants me to fly free after the 4 months if we are comfortable in what we have learned. Lets hope the blood work next month reflects the change. I was pre-diabetic last year so this was a needed change for health reasons. The benefit - I am sleeping better, have more energy and feel much better! Heck - the size 14 pants are too big and the size 12 are comfortable to a little big =) 

We won't go into yesterday's dentist episode. I had a tooth infection, which needed cleaning out, antibiotics and then a root canal 2 weeks after that had healed. Then 3 weeks to get the temporary crown..... which should have been a 1.5-2 hour appointment but was more like 3 hours. Another 2 weeks and I went yesterday to get the permanent crown on... they put it in and said to bite down. I did. Crunch! It broke and there was a perfect circle out of it! Sigh... They fixed that one up and put it in as a temporary crown and made the mold for another permanent crown to be made. I get to wait almost 3 weeks this time .... Sigh. It has been a long 2+ months. On the positive - I'm not paying for this 'additional' stuff and it doesn't hurt. I just can't eat sticky things.... or popcorn. I do love my popcorn at night so it has been a very long time........

On tap for today is some outside work in the garden and trimming of the various bushes around the house. Some digging around the coop as well. But first... I think I'll visit the sewing room and play with some fabric.

Saturday, October 3, 2020

Stars and Nines is Finished!


 Stars and Nines is finished! Well, I do need to snip threads and write the label and toss it in the wash.... but it is DONE! I plan to mail this out to my sister on Monday. 

Linking up with the RSC Challenge!

RSC in Yellow????

 Since that is the last color of the rainbow and we have not worked on it yet this year I believe yellow is Octobers color of the month!

I technically did a little yellow last month to make a couple stars and nines... which is getting it's binding hand sewn down today.  I plan to wash it on Sunday and mail it out on Monday to my sister. This one finishes at 48x60. 


I was able to cut out the 14 yellow cobblestone blocks. Those will get sewn up today and made into their strip. I purchased some grey for the strip in between each of the rows already. My hope is to have that one to a top by next week. Ignore the mess under the sewing table!


I'll bring my Endless Diamonds to Emilys horse riding lesson today.... there is a little yellow. I went with a 'halloween' theme for this block! 


A lot of building has been happening in the back yard. Seems if you get chickens at different times you can't just put them in together when they are different sizes.... So Greg got to build another coop! This is bigger and more stable and will eventually house all 9 of them. Yes, it does look like an outhouse! The 'extra' one will be used for separating them if someone is sick or for when they come back from the fair for a week or two.  The two runs will be connected with chicken wire in between the two. We will add a door for when we can intermingle them so they have more space to be. 

 We'll keep the 4 big ladies where they are for now until the 5 that are inside are to full size in another few months. 3 of the 5 are ready for outside so I was happy with the progress made on the coop over the last few days. He did make me nervous up on the roof yesterday though. Good thing his life insurance is all paid up! =) 


Linking up with the RSC today.

Thursday, October 1, 2020

October OMG - One Monthly Goal.

Since September was a great goal month with the midge applique quilt - I decided on a pattern for the borders and got a good start on them. I think in October I should continue on and get this baby to a completed TOP. Not quilted mind you... but I do have a plan in my head on hand quilting already.



That's it. Get the applique borders completed and attached to the quilt for a completed top.

Linking up with the October OMG. Wish me luck! 

Wednesday, September 30, 2020

September OMG progress

 


Well, some progress was made to this quilt this month! I made 4 borders in yellow and have vines attached to parts of 3 of them with a couple of flowers on each so far. Two of the borders are attached. Since I have done this one all by hand, I decided to continue with the hand piecing on all of this one. I need to attach the third border and connect my vine around the corner. I figured that would be easier once the borders are attached. I am happy with the progress on this in September.

Linking up with the OMG end of September link up.

Tuesday, September 29, 2020

Fall 2020 Ravelry Challenge to finish off projects!

 Since I successfully finished off 3 of my quilts from the Summer Challenge, I think I'll join in on the Fall 2020 Challenge. Now to pick out some projects to finish off! You would think it would be easy with the RSC Challenge finishing up with collections of blocks ready to go by the end of October!

Time to pick some projects - I'll put most of my RSC ones on and add a few others just for fun.... and in case I feel like working on them! Here is a long list in no particular order!

1.) Stashbuster 2020 block - I set 4 blocks together each month in the RSC Color making 2 'blocks' each month. I need to add 2 yellows and then lay them out into a top.

2.) Stars and Nines. This one just needs some quilting and the binding attached. ** Finished 10/3/2020.


3.) Hexagon flowers on a black background. These are a stack of blocks I made a few years ago. Not sure if they will become one or two quilts....

4.) This one stayed on the list - needs quilting. Vermont Quilt Festival Booth Hop from either 2008 or 2009.

5.) Hand pieced quilt along- needs hand quilting. Small quilt. ** Finished 12/27/2020.

6.) Crumb blocks.... might these end up in a quilt?

7.) Small triangle scraps...this will be finished into a hot mat I think. 9 inches square ** Finished 10/8/2020.

8.) Small magic stars

9.) Keeping this one on just in case - the Kim Diehl kit Bittersweet Briar.

10.) Sweet Confetti blocks - I have 86 of these made.... I need 10 more yellows so I can finish it off.


11.) Mini magic stars - **Finished in December

12.) Cobblestone rows. I added a black as well and need to make a yellow strip. **Finished 11/10/2020.

13.) Midget Applique quilt from Sentimental Stitches. I need to add 2 more borders and flowers and leaves to the vines.


14.) Ella Maria Deacon blocks - make a few more and finish them off into a top. I believe I was making these by hand. Patterns from Sentimental Stitches.



15.) Cat and mouse is on the frame in process of hand quilting but has been sadly neglected.

16.) Hand pieced quilt along top needs to get hand quilted.

17.) Green Tumblers
18.) Purple applique hearts... need to figure out how they want to be set.

19.) Hoarfrost - top is done will it get quilted this year?


20.) Since I could not leave it on an odd number....I added this quilt that has been an on and off, leader and ender for years. My scrappy irish chain. I believe I had a bucket of 2 inch squares next to my sewing machine for a while and would make sets, and rows and blocks in between sewing other things. I think it wants to get competed.




I guess that should be enough to 'select' from. I hope to get through a few of them this quarter with some finishes..... you know, so I can start more projects! Hehehe.....