Monday, December 31, 2012

Unable to sleep.....

So I got up and decided to try and catch up a bit on Easy Street. I cut out 145 green squares to finish off step 4. I had pieced the geese units together last week.

Then I cut out the 3.5 inch blue squares - I had a stack already sitting that were leftover from the anniversary quilt a few years ago so I only had to cut out half of what was needed. That was a nice bonus. Now I need to cut the 128 maroon squares to go with that step so I can sew them up later this week.

Then I cut some cream strips for step 6. At that point it is 5AM and the girl was making noise so I had to go cover her up and get her settled in again. I figured I should vacate the room next to hers so I decided to update the blog.

I also have been plugging away on a baby quilt for Aidan's teacher. She is due January 9 (cutting it close I know!) and hopefully she will be in on Wednesday when he goes back to school.... and the quilt will be done! It is a top. The back is pieced. The binding is made. I just need to pin it and do some quick quilting on it later this afternoon after  work. I see some binding stitching in my future tonight and tomorrow. I'm wishing I took the hubby's advice and finished the pink chain part in the side and top border.... but it is done and I'm not changing it now. The binding will be the pink and the backing is a green polka dot with monkey's.


Once that is done, I am jumping back to the Easy Street mystery. She posted step 7 this morning and yikes.... it looks like the last step is tomorrow! Of course... I need to get a midget done, a Quilt Square Along Block and I'm behind on the Sufferage BOW..... and I need to prep some hand work for next week. Oh well, as long as the baby quilt is done by Wednesday and I have something to work on while I am away I'll be happy. I think I just bumped up prep of some Orange Peels after this baby quilt is done.

Saturday, December 29, 2012

A load of scraps for 2013...

I decided to take a shower this morning and leave the bucket of scrap fabrics out for the kids to sort. This is what I walked out to after 5 minutes....... it's an Aidan fabric monster!


As you can see - once it is all sorted I'll have lots of pretty fabrics to work with in 2013 for the rainbow scrap challenge. Pink was chosen for the month of January. I'll have to create my template for the orange peels and get cutting away so I have things prepped for next weekend. The hubby and I have a conference that week and we are heading out a couple day's early without kids. Grandma agreed to stay with the kids and cart them to school and dance classes. I can't wait to dig in and play with some pinks. I think I'll be doing a snails trail in light/dark shades each month along with the orange peel blocks from the 'Remembering Adelia' book. I may have to do some more birds in the air block too.... I need to spread them out and see what I need to finish off my 2012 Rainbow quilt.


Head on over to SoScrappy and see what others are planning for 2013. Oh - yesterday was 'project' and craft day for the kids. This was one that they have been bugging me for a week to do. This was after about an hour.


and this is this morning's results.

They also got little felt sewing kits for Christmas and after some frustration in doing the thread/needle part - the yarn kept sliding out of the needle causing some frustration. (Mommy got to do that part) They stuffed them and then added the sequins and/or eyes. Emily did a yellow cat and Aidan made a yellow flower. Sometime they will get to the heart and butterfly. 



Friday, December 28, 2012

Wrapping up 2012

I like to look back and see what I have accomplished in the sewing room this time of the year. Enjoy.
Completed quilts - even if the pictures are of just the tops. I can't seem to find the finished shots!
Crumb quilt for Emily.

12 inch log cabin Quilt Square Along quilt. Hand quilted. 


Jacobs Ladder - currently on my side of the bed. It is darn chilly down here in Florida - near freezing the last few mornings.

Starburst - for Mindy - graduation quilt


Baby Bunting - for Gail's granddaughter.

Irish Chain #1 - donated


Scrappy Pinwheel - donated.

irish chain - red/tan - donated



scrappy pinwheel 2 - donated

tops completed:

scrappy log cabin - pinned and waiting for quilting.


Aidan's star quilt - have backing. ready for quilting.



pink string X- added the final border - ready for quilting.


I'm sure there are other things I am missing but I think that is a pretty good record for 2012! I plan to do a recap of the BOM and BOW projects this year in another post. 2013 I am planning to finish some UFO's that have been hanging around. Then there will be the new projects.... I got three new quilting books for Christmas and have gotten lots of 'inspiration'. I believe G said - 'Hope you like them and that they give you lots of inspiration for your quilting!'. I do love my hubby.
He got me 'Remembering Adelia' by Kathleen Tracy (so I have the template to do my Orange Peels), 'The Civil War Sewing Circle' by Kathleen Tracy and 'Civl War Legacies' by Carol Hopkins.  I have been looking through the books every day since I got them and love all the little quilts in the book. I think a few will get made in 2013.

For now, I'd better get everyone dressed so I can tire out the kiddo's this morning to allow me some sewing time this afternoon. I started a baby double irish chain on Wednesday and need to get it done for next Wednesday. Wish me luck!



Tuesday, December 25, 2012

Tiny Tuesday

#69 Mexican Star went together really easily this afternoon. The kids were out running around and I was able to steal away into the sewing room. Now if we can get the kids down early for bedtime (they slept in until 7 but no naps!), I think we'll curl up on the couch with a movie. Merry Christmas.


Merry Christmas


Wishing you all a very Merry Christmas.

Sunday, December 23, 2012

Sunday slow down....

I was able to make the T block over the last few days. I think it came out pretty cute, after a bit of frogging on a couple of steps.


I've also made more progress on that Sunflower block from week 4. This one has been hand pieced. Almost to my goal of getting it done by Christmas. I just have to sew down the middle.... the brown might change colors. I also might pick out the outer green and just applique it down onto a square instead. I don't like how it is puckering.


How are you coming along on this block? I am joining up with Quilter Kathy for a slow down Sunday. I got all the kids presents wrapped this morning and tucked back away in the closet. I just need to go out to get a few groceries and some stocking stuffers for hubby and the kids and I'm calling it done. Then I can settle down with some hand stitching and relax. Head on over and see what others are working on.



Thursday, December 20, 2012

Easy Street part 3.....

I was able to get part three all cut out and sewn yesterday! I think I can get back on track over the next week and get all caught up for next Friday. Yes, there are 63 on the floor. #64 is under the presser foot on the machine.

I finally got to cut into some blue fabrics. I decided to go from light to dark with some brights in between. I see I get to use more in the next step and have some 2 inch strips left over from a project a few years ago that will be perfect for the wings. Good thing I cut way too many 2 inch maroon strips! I can use them in step 4.


Me and Emily - excuse the mess! Taken by my 4 year old.